Date: 2023-07-07 20:00 - 2023-07-07 21:00 UTC +8.
Scope: Taiwan DC-1 Core Network.
Reason: Connect to new upstream and optimize latency.
Sphere of influence:May cause disconnect many times. After maintenance done, latency to Asia will be lower.
Date: 2023-07-07 20:00 - 2023-07-07 21:00 UTC +8.
Scope: Taiwan DC-1 Core Network.
Reason: Connect to new upstream and optimize latency.
Sphere of influence:May cause disconnect many times. After maintenance done, latency to Asia will be lower.
Date: 2023-05-19 20:00 - 2023-05-19 21:00 UTC +8.
Scope: Taiwan DC-1 Core Network.
Reason: Connect to new upstream and optimize latency.
Sphere of influence:May cause disconnect many times. After maintenance done, latency to Asia will be lower.
Date: 2023-04-10 23:30 - 2023-04-11 4:30 UTC +8.
Maintenance Scope: Japanese Internet.
Maintenance Content: Upgrading the Japanese Internet.
Impact Range: Possible increase in connection delays.
Date: 2023 / 03 / 25 0:00 - 23:59 (UTC +8).
Node: TW-01.
Reason: Optimize Taiwan core router and fix proxy problems.
Sphere of influence: TW-01 node.